Content:
Practices and Legislation for the periodic inspection, testing and condition reporting of electrical installations.
Requirements for inspecting, and recording the condition of electrical installations
Requirements for completing the safe isolation of electrical circuits and installations
Requirements for completing the periodic inspection of electrical installations
Differences between periodic inspection and initial verification
Requirements for testing before circuits are live.
Requirements for testing live installations
Understanding and interpreting test results
Requirements for the completion of electrical installation condition reports
Carrying out inspection of electrical installations prior to them being put into service
Produce a condition report with recording observations and classification
In order to claim the full 2391-51 qualification, students must complete the following 3 units:
⦁ On-Line multiple choice exam – 40-Question, Open Book
⦁ 1Hour 20 minutes Written Exam (pre-set by the City & Guilds)
⦁ Practical Assessment
Practical/theory Assessments 1. Visual inspection (30 minutes) – closed book. 2. Electrical Condition Report and test (1 hours 30 minutes plus 30 minutes to complete paperwork) – open
Required Literature:
BS7671: 2018 - 18th Edition and Guidance Note 3 with the Blue band at bottom (to comply with the 18th Edition)
To book a place on the C&G 2391-51 course select your start date below and follow the booking procedure.
PRICE INCLUDES VAT & REGISTRATION FEES